Robust systems are essential in the fast-paced and ever-evolving world of technology, where even minor disruptions can cascade into significant downtime or data loss. Yet even the most resilient infrastructure can falter without proper change management. This two-part series delves into the critical importance of two foundational practices: change control policies and rollback plans.
In Part 1, we’ll explore the value of establishing robust change control policies that minimize risks and ensure every modification to a system is deliberate, tested, and aligned with organizational goals.
Part 1: The Value of Robust Change Control Policies
Smart businesses and organizations must remain agile for both scalability and a constantly evolving technological landscape, to sustain a stable and secure infrastructure to support their operations. When dealing with complex systems, the margin for error is slim because even a minor misconfiguration or unexpected interaction can lead to significant disruptions. We spend a lot of effort to build robust, scalable, and resilient services, but humans still manage those services. Human error is attributed as one (if not the largest) source of unplanned downtime. Kevin Heslin, chief editor of the Uptime Institute Journal, stated in this blog post:
Perhaps there is simply a limit to what can be achieved in an industry that still relies heavily on people to perform many of the most basic and critical tasks and thus is subject to human error, which can never be completely eliminated.
This is where the importance of robust change control policies and effective rollback plans comes into play.
What is Change Control?
Change control is the process of managing how changes are introduced into a system. A robust change control policy ensures that any modification — a patch, an upgrade, or a configuration change — is planned, tested, reviewed, and approved before implementation. This process minimizes the risk of unintentional disruptions and ensures that changes align with business objectives.
Key Components of a Robust Change Control Policy
- Communication: All stakeholders, including IT teams, management, and end-users, should be informed of upcoming changes. This communication helps prepare the organization for any potential impact and reduces the risk of surprise disruptions.
- Approval Process: Changes should be reviewed and approved by relevant stakeholders before they are applied. This ensures that all potential impacts are considered and that the change aligns with organizational goals.
- Detailed Documentation: Every change should be thoroughly documented, including the reason for the change, the expected outcome, and potential risks. This documentation serves as a reference for both the implementation at hand as well as future changes and internal audits.
- Testing Environment: Before applying changes to the production environment, they should be tested in a controlled environment that mirrors production as closely as possible. This step helps identify unforeseen issues and provides an opportunity to fine-tune the change.
Greg Dostatni, known for his expertise as a DBA for Command Prompt, shared a keen observation about a common challenge in change control:
This is where I see most companies fail. Replicating the production load is hard. Would it make sense to say and acknowledge that fact and put it as justification for why you may want a rollback procedure?
This observation leads us to the next topic – the essential role of rollback plans as a safety net, ensuring that systems can recover quickly and effectively when unforeseen challenges arise in production environments. Stay tuned for "Part 2: The Essential Role of Rollback Plans".